General information about company

Scrip code*544504
NSE Symbol*NOTLISTED
MSEI Symbol*NOTLISTED
ISIN*INE0ZOM01013
Name of companyGoel Construction Company Limited
Type of companySME
Class of securityEquity
Date of start of financial year01-04-2025
Date of end of financial year31-03-2026
Date of board meeting when results were approved18-05-2026
Date on which prior intimation of the meeting for considering financial results was informed to the exchange09-05-2026
Description of presentation currencyINR
Level of roundingLakhs
Reporting TypeHalf Yearly
Reporting QuarterYearly
Nature of report standalone or consolidatedStandalone
Whether results are audited or unaudited for the quarter endedAudited
Whether results are audited or unaudited for the Year to date for current period ended/year endedAudited
Segment ReportingSingle segment
Description of single segmentCivil Construction
Start date and time of board meeting18-05-2026 17:00
End date and time of board meeting18-05-2026 18:30
Whether cash flow statement is applicable on companyYes
Type of cash flow statementCash Flow Indirect
Declaration of unmodified opinion or statement on impact of audit qualificationDeclaration of unmodified opinion
Whether the company has any related party?Yes
Whether the company has entered into any Related Party transaction during the selected half year for which it wants to submit disclosure?Yes
(I) We declare that the acceptance of fixed deposits by the bans/Non-Banking Finance Company are at the terms uniformly applicable/offered to all shareholders/publicNA
(II) We declare that the scheduled commercial bank, as per RBI circular RBI/DBR/2015-16/19 dated March 03, 2016, has allowed additional interest of one per cent per annum, over and above the rate of interest mentioned in the schedule of interest rates on savings or a term deposits of bank’s staff and their exclusive associations as well as on deposits of Chairman, Chairman & Managing Director, Executive Director or such other Executives appointed for a fixed tenure.NA
(III) Whether the company is a ‘high value debt listed entity’ according to regulation 15 (1A)?No
(a) If answer to above question is Yes, whether complying with proviso to regulation 23 (9), i.e., submitting RPT disclosures on the day of results publication?
(b) If answer to above question is No, please explain the reason for not complying.
Whether the updated Related Party Transactions (RPT) Policy (in compliance with Reg. 23 of SEBI LODR) has been uploaded on the website of the Company?Yes
Latest Date on which RPT policy is updated18-03-2026
Indicate Company website link for updated RPT policy of the Companygoelconstruction.co.in
Whether statement on deviation or variation for proceeds of public issue, rights issue, preferential issue, qualified institutions placement etc. is applicable to the company for the current quarter?Yes
No. of times funds raised during the quarter1
Whether the disclosure for the Default on Loans and Debt Securities is applicable to the entity?NoThere is no default during the period under review, therefore, there is no disclosure requirement.



Financial Results – Other than Bank

Particulars3 months/ 6 months ended (dd-mm-yyyy)Year to date figures for current period ended (dd-mm-yyyy)
Date of start of reporting period01-10-202501-04-2025
Date of end of reporting period31-03-202631-03-2026
Whether results are audited or unauditedAuditedAudited
Nature of report standalone or consolidatedStandaloneStandalone
Part IBlue color marked fields are non-mandatory. For Consolidated Results, if the company has no figures for 3 months / 6 months ended, in such case zero shall be inserted in the said column.
1Revenue From Operations
Revenue from operations41191.9565729.65
Other income464.05798.18
Total Income4165666527.83
2Expenses
(a)Cost of materials consumed12314.3117526.41
(b)Purchases of stock-in-trade00
(c)Changes in inventories of finished goods, work-in-progress and stock-in-trade71.3-420.9
(d)Employee benefit expense 3732.616809.89
(e)Finance costs540.221019.73
(f)Depreciation and amortisation expense493.31898.23
(g)Other Expenses
1Construction Expenses20094.5833675.7
2General Administration Expenses433.24811.32
Total other expenses20527.8234487.02
Total expenses37679.5760320.38
3Profit before exceptional and extraordinary items and tax 3976.436207.45
4Exceptional items 00
5Profit before extraordinary items and tax3976.436207.45
6Extraordinary items00
7Profit before tax3976.436207.45
8Tax Expense
Current tax983.311539.25
Deferred tax43.6442.37
Total tax expenses1026.951581.62
9Net Profit Loss for the period from continuing operations2949.484625.83
10Profit (loss) from discontinuing operations before tax00
11Tax expense of discontinuing operations00
12Net profit (loss) from discontinuing operation after tax00
13Profit (loss) for period before minority interest2949.484625.83
14Share of profit (loss) of associates
15Profit (loss) of minority interest
16Net profit (Loss) for the period2949.484625.83
17Details of equity share capital
Paid-up equity share capital1444.961444.96
Face value of equity share capital1010
Details of debt securities
18Reserves excluding revaluation reserve23961.58
19Earnings per equity share (for continuing and discontinued operations)
Basic earnings (loss) per share from continuing and discontinued operations21.0535.25
Diluted earnings (loss) per share from continuing and discontinued operations21.0535.25
20Debt equity ratioTextual Information( 1)
21Debt service coverage ratioTextual Information( 2)
22Interest service coverage ratioTextual Information( 3)
23Disclosure of notes on financial results

Statement of Asset and Liabilities

ParticularsYear ended (dd-mm-yyyy)
Date of start of reporting period01-04-2025
Date of end of reporting period31-03-2026
Whether results are audited or unauditedAudited
Nature of report standalone or consolidatedStandalone
Equity and liabilities
1Shareholders' funds
Share capital1444.96
Reserves and surplus23961.58
Money received against share warrants0
Total shareholders' funds25406.54
2Share application money pending allotment0
3Deferred government grants0
4Minority interest
5Non-current liabilities
Long-term borrowings185.03
Deferred tax liabilities (net)168.32
Foreign currency monetary item translation difference liability account0
Other long-term liabilities
1
2
3
4
5
Details of other long-term liabilities
Total of other long-term liabilities
Long-term provisions221.92
Total non-current liabilities575.27
6Current liabilities
Short-term borrowings612.27
Trade Payables
(A) Total outstanding dues of micro enterprises and small enterprises288.09
(B) Total outstanding dues of creditors other than micro enterprises and small enterprises3446.11
Total Trade payable3734.2
Other current liabilities
1 Advance from customers11663.76
2Other current liabilities3370.83
3
4
5
Details of other current liabilities
Total of other current liabilities15034.59
Short-term provisions138.73
Total current liabilities19519.79
Total equity and liabilities45501.6
Assets
1Non-current assets
(i)Property, Plant and Equipment and Intangible assets
Property, Plant and Equipment9997.29
Producing properties0
Intangible assets26.07
Preproducing properties0
Property, Plant and Equipment capital work-in-progress291.64
Intangible assets under development or work-in-progress0
Total Property, Plant and Equipment and Intangible assets10315
(ii)Non-current investments4704.22
(v)Deferred tax assets (net)0
(vi)Foreign currency monetary item translation difference asset account0
(vii)Long-term loans and advances67.54
Other non-current assets
1Other non-current assets847.77
2
3
4
5
Details of other non-current assets
Total of other non-current assets847.77
Total non-current assets15934.53
2Current assets
Current investments1707.44
Inventories3732.98
Trade receivables7029.4
Cash and cash equivalents1946.63
Bank balance other than cash and cash equivalents6152.13
Short-term loans and advances2387.34
Other current assets
1Other current assets6611.15
2
3
4
5
Details of other current assets
Total of other current assets6611.15
Total current assets29567.07
Total assets45501.6
Disclosure of notes on assets and liabilitiesTextual Information(1)

Text Block

Textual Information(1)


Format for Reporting Segment wise Revenue, Results and Capital Employed along with the company results

Particulars3 months/ 6 months ended (dd-mm-yyyy)Year to date figures for current period ended (dd-mm-yyyy)
Date of start of reporting period01-10-202501-04-2025
Date of end of reporting period31-03-202631-03-2026
Whether results are audited or unauditedAuditedAudited
Nature of report standalone or consolidatedStandaloneStandalone
1Segment Revenue
(net sale/income from each segment should be disclosed)
1
Total segment revenue
Less: Inter segment revenue
Revenue from operations
2Segment Result
Profit (+) / Loss (-) before tax and interest from each segment
Total Profit before tax
i. Finance cost
ii. Other unallocable expenditure net off unallocable income
Profit before tax
3(Segment Asset - Segment Liabilities)
Segment Asset
Total Segment Assets
Un-allocable Assets
Net Segment Assets
4Segment Liabilities
Segment Liabilities
Total Segment Liabilities
Un-allocable Liabilities
Net Segment Liabilities

Cash flow statement - indirect

ParticularsYear ended (dd-mm-yyyy)
Date of start of reporting period01-04-2025
Date of end of reporting period31-03-2026
Whether results are audited or unauditedAudited
Nature of report standalone or consolidatedStandalone
1Statement of cash flows
Cash flows from used in operating activities
Profit before extraordinary items and tax6207.45
2Adjustments for reconcile profit (loss)
Adjustments to profit (loss)
Adjustments for finance costs1019.73
Adjustments for depreciation and amortisation expense898.23
Adjustments for impairment loss reversal of impairment loss recognised in profit or loss0
Adjustments for unrealised foreign exchange losses gains0
Adjustments for dividend income0
Adjustments for share-based payments0
Other adjustments for which cash effects are investing or financing cash flow-785.79
Other adjustments to reconcile profit (loss)0
Other adjustments for non-cash items0
Share of profit and loss from partnership firm or association of persons or limited liability partnerships0
Total adjustments to profit (loss)1132.17
3Adjustments for working capital
Adjustments for decrease (increase) in inventories-2617.45
Adjustments for decrease (increase) in trade receivables-4252.61
Adjustments for decrease (increase) in other current assets-1498.64
Adjustments for increase (decrease) in trade payables322.16
Adjustments for increase (decrease) in other current liabilities8402.56
Adjustments for provisions124.09
Total adjustments for working capital480.11
Total adjustments for reconcile profit (loss)1612.28
Net cash flows from (used in) operations7819.73
Dividends received0
Interest paid0
Interest received2.01
Income taxes paid (refund)1539.27
Other inflows (outflows) of cash0
Net cash flows from (used in) operating activities before extraordinary items6282.47
Proceeds from extraordinary items0
Payment for extraordinary items0
Net cash flows from (used in) operating activities6282.47
4Cash flows from used in investing activities
Cash flows from losing control of subsidiaries or other businesses0
Cash flows used in obtaining control of subsidiaries or other businesses0
Other cash receipts from sales of equity or debt instruments of other entities0
Other cash payments to acquire equity or debt instruments of other entities0
Other cash receipts from sales of interests in joint ventures0
Other cash payments to acquire interests in joint ventures0
Cash receipts from share of profits of partnership firm or association of persons or limited liability partnerships0
Cash payment for investment in partnership firm or association of persons or limited liability partnerships0
Proceeds from sales of property plant and equipment399.58
Purchase of property plant and equipment3492.5
Proceeds from sales of intangible assets0
Purchase of intangible assets26.07
Cash advances and loans made to other parties0
Cash receipts from repayment of advances and loans made to other parties435.3
Cash payments for future contracts, forward contracts, option contracts and swap contracts0
Cash receipts from future contracts, forward contracts, option contracts and swap contracts0
Dividends received0
Interest received669.62
Income taxes paid (refund)0
Other inflows (outflows) of cash-8103.88
Proceeds from government grants0
Net cash flows from (used in) investing activities before extraordinary items-10117.95
Proceeds from extraordinary items0
Payment for extraordinary items0
Net cash flows from (used in) investing activities-10117.95
5Cash flows from used in financing activities
Proceeds from issuing shares7548.87
Proceeds from issuing other equity instruments0
Proceeds from issuing debentures notes bonds etc0
Proceeds from borrowings921.09
Repayments of borrowings2994.76
Dividends paid0
Interest paid1019.73
Income taxes paid (refund)0
Other inflows (outflows) of cash0
Net cash flows from (used in) financing activities before extraordinary items4455.47
Proceeds from extraordinary items0
Payment for extraordinary items0
Net cash flows from (used in) financing activities4455.47
Net increase (decrease) in cash and cash equivalents before effect of exchange rate changes619.99
6Effect of exchange rate changes on cash and cash equivalents
Effect of exchange rate changes on cash and cash equivalents0
Net increase (decrease) in cash and cash equivalents619.99
Cash and cash equivalents cash flow statement at beginning of period1326.64
Cash and cash equivalents cash flow statement at end of period1946.63

Format for Disclosure of Related Party Transactions (applicable only for half-yearly filings i.e., 2nd and 4th quarter)

Additional disclosure of related party transactions - applicable only in case the related party transaction relates to loans, inter-corporate deposits, advances or investments made or given by the listed entity/subsidiary. These details need to be disclosed only once, during the reporting period when such transaction was undertaken.
Sr. No.Details of the party (listed entity /subsidiary) entering into the transactionDetails of the counterpartyType of related party transactionDetails of other related party transactionValue of the related party transaction as approved by the audit committeeRemarks on approval by audit committeeValue of the related party transaction ratified by the audit committeeDate of Audit Committee Meeting where the ratification was approvedValue of transaction during the reporting periodIn case monies are due to either party as a result of the transactionIn case any financial indebtedness is incurred to make or give loans, inter-corporate deposits, advances or investmentsDetails of the loans, inter-corporate deposits, advances or investments
NamePANNamePANRelationship of the counterparty with the listed entity or its subsidiaryOpening balanceClosing balanceNature of indebtedness (loan/ issuance of debt/ any other etc.)Details of other indebtednessCostTenureNature (loan/ advance/ intercorporate deposit/ investment)Interest Rate (%)TenureSecured/ unsecuredPurpose for which the funds will be utilised by the ultimate recipient of funds (endusage)Notes
1Goel Construction Company LimitedAAACG7717RPurushottam Dass GoelABCPG8495LKey Management PersonnelRemuneration0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.3383.5
2Goel Construction Company LimitedAAACG7717RPurushottam Dass GoelABCPG8495LKey Management PersonnelInterest paid0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.0.3900Loan10.00%5Unsecured Business Purpose
3Goel Construction Company LimitedAAACG7717RPurushottam Dass GoelABCPG8495LKey Management PersonnelAny other transactionRepayment of Loan0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.8.949.340Loan10.00%5Unsecured Business Purpose
4Goel Construction Company LimitedAAACG7717RArun Kumar GoelABCPG8570EKey Management PersonnelRemuneration0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.276.32.95
5Goel Construction Company LimitedAAACG7717RArun Kumar GoelABCPG8570EKey Management PersonnelInterest paid0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.0.4500Loan10.00%5Unsecured Business Purpose
6Goel Construction Company LimitedAAACG7717RArun Kumar GoelABCPG8570EKey Management PersonnelAny other transactionRepayment of Loan0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.10.2510.710Loan10.00%5Unsecured Business Purpose
7Goel Construction Company LimitedAAACG7717RChaman LalAATPL7140HKey Management PersonnelAny other transactionDirector sitting fees0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.00.150
8Goel Construction Company LimitedAAACG7717RMahesh Chandra AgrawalACIPA7375GKey Management PersonnelAny other transactionDirector sitting fees0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.0.180.450.16
9Goel Construction Company LimitedAAACG7717RSakshi AgarwalBVHPA3032PKey Management PersonnelAny other transactionDirector sitting fees0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.0.350.60.32
10Goel Construction Company LimitedAAACG7717RSoni GoelAITPG6170EKey Management PersonnelRemuneration0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.121.721.5
11Goel Construction Company LimitedAAACG7717RNaresh Kumar GoelABCPG8526CRelative of DirectorAny other transactionRent paid5891No comments0.420.140
12Goel Construction Company LimitedAAACG7717RNaresh Kumar GoelABCPG8526CRelative of DirectorInterest paid0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.0.0300Loan10.00%5Unsecured Business Purpose
13Goel Construction Company LimitedAAACG7717RNaresh Kumar GoelABCPG8526CRelative of DirectorAny other transactionRepayment of Loan0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.0.760.80Loan10.00%5Unsecured Business Purpose
14Goel Construction Company LimitedAAACG7717RPrem GoelABKPG0351KRelative of DirectorInterest paid0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.0.6100Loan10.00%5Unsecured Business Purpose
15Goel Construction Company LimitedAAACG7717RPrem GoelABKPG0351KRelative of DirectorAny other transactionRepayment of Loan0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.13.9614.590Loan10.00%5Unsecured Business Purpose
16Goel Construction Company LimitedAAACG7717RRatan Kumar GoelABCPG8571FRelative of DirectorAny other transactionSalary30No comments12.92.91.7
17Goel Construction Company LimitedAAACG7717RRatan Kumar GoelABCPG8571FRelative of DirectorAny other transactionRent paid5891No comments0.420.140
18Goel Construction Company LimitedAAACG7717RRatan Kumar GoelABCPG8571FRelative of DirectorInterest paid0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.0.100Loan10.00%5Unsecured Business Purpose
19Goel Construction Company LimitedAAACG7717RRatan Kumar GoelABCPG8571FRelative of DirectorAny other transactionRepayment of Loan0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.2.392.490Loan10.00%5Unsecured Business Purpose
20Goel Construction Company LimitedAAACG7717RSatish GoelABCPG8645ARelative of DirectorInterest paid0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.0.3400Loan10.00%5Unsecured Business Purpose
21Goel Construction Company LimitedAAACG7717RSatish GoelABCPG8645ARelative of DirectorAny other transactionRepayment of Loan0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.7.818.170Loan10.00%5Unsecured Business Purpose
22Goel Construction Company LimitedAAACG7717RVijay Kumar GoelABCPG8421CRelative of DirectorInterest paid0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.0.1500Loan10.00%5Unsecured Business Purpose
23Goel Construction Company LimitedAAACG7717RVijay Kumar GoelABCPG8421CRelative of DirectorAny other transactionRepayment of Loan0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.3.393.540Loan10.00%5Unsecured Business Purpose
24Goel Construction Company LimitedAAACG7717RAmit GoelAASPG5064ERelative of DirectorAny other transactionSalary30No comments153.471.97
25Goel Construction Company LimitedAAACG7717RAmit GoelAASPG5064ERelative of DirectorAny other transactionRent paid5891No comments0.420.140
26Goel Construction Company LimitedAAACG7717RAmit GoelAASPG5064ERelative of DirectorInterest paid0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.0.0200Loan10.00%5Unsecured Business Purpose
27Goel Construction Company LimitedAAACG7717RAmit GoelAASPG5064ERelative of DirectorAny other transactionRepayment of Loan0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.0.440.460Loan10.00%5Unsecured Business Purpose
28Goel Construction Company LimitedAAACG7717RAnuj GoelAAVPG8506GRelative of DirectorAny other transactionSalary30No comments153.471.97
29Goel Construction Company LimitedAAACG7717RAnuj GoelAAVPG8506GRelative of DirectorInterest paid0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.0.0200Loan10.00%5Unsecured Business Purpose
30Goel Construction Company LimitedAAACG7717RAnuj GoelAAVPG8506GRelative of DirectorAny other transactionRepayment of Loan0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.0.350.370Loan10.00%5Unsecured Business Purpose
31Goel Construction Company LimitedAAACG7717RAshwani GoelAHHPG7696JRelative of DirectorAny other transactionSalary30No comments184.12.3
32Goel Construction Company LimitedAAACG7717RIsha GoelAIZPG1841QRelative of DirectorAny other transactionSalary30No comments61.50.9
33Goel Construction Company LimitedAAACG7717RIsha GoelAIZPG1841QRelative of DirectorAny other transactionRent paid5891No comments00.170
34Goel Construction Company LimitedAAACG7717RIsha GoelAIZPG1841QRelative of DirectorInterest paid0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.0.0600Loan10.00%5Unsecured Business Purpose
35Goel Construction Company LimitedAAACG7717RIsha GoelAIZPG1841QRelative of DirectorAny other transactionRepayment of Loan0The approval of the Audit Committee has been taken for the RPTs whereever applicable and accordingly reported.1.491.570Loan10.00%5Unsecured Business Purpose
36Goel Construction Company LimitedAAACG7717RInder GoelABKPG9077ERelative of DirectorAny other transactionSalary30No comments11.852.671.58
37Goel Construction Company LimitedAAACG7717RAyushi GoyalBRYPG4188DRelative of DirectorAny other transactionSalary30No comments3.60.90.6
38Goel Construction Company LimitedAAACG7717RChinmay GoelDGGPG8264MRelative of DirectorAny other transactionSalary30No comments14.45.120
39Goel Construction Company LimitedAAACG7717RMohak GoelDSZPG9197LRelative of DirectorAny other transactionSalary30No comments10.767.080
40Goel Construction Company LimitedAAACG7717RNatwar Lal LadhaACYPL9560EKey Management PersonnelAny other transactionSalary0Not Applicable14.4300
41Goel Construction Company LimitedAAACG7717RNatwar Lal LadhaACYPL9560EKey Management PersonnelAny other transactionAdvance received back0Not Applicable5.521.516
42Goel Construction Company LimitedAAACG7717RSurbhi MalooEVGPM3054RKey Management PersonnelAny other transactionSalary0Not Applicable4.060.610
43Goel Construction Company LimitedAAACG7717RSurbhi MalooEVGPM3054RKey Management PersonnelAny other transactionAdvance received back0Not Applicable0.6143.39
44Goel Construction Company LimitedAAACG7717RAnuj ConstructionAAVPG8506GEnterprises in which Key Management Person and their Relatives are interestedAny other transactionRent paid5891No comments0.42343.060
45Goel Construction Company LimitedAAACG7717RAnuj ConstructionAAVPG8506GEnterprises in which Key Management Person and their Relatives are interestedAny other transactionContract Receipts5891No comments412.370.170
46Goel Construction Company LimitedAAACG7717RGoel Construction Company, HisarAAQFG5888AEnterprises in which Key Management Person and their Relatives are interestedAny other transactionWorks Expenses5891No comments270.6159.130
47Goel Construction Company LimitedAAACG7717RGanpati EnterprisesABDFG6202EEnterprises in which Key Management Person and their Relatives are interestedSale of fixed assets5891No comments38000
Total value of transaction during the reporting period1321.24



Details of Impact of Audit Qualification

Whether results are audited or unauditedAudited
Declaration of unmodified opinion or statement on impact of audit qualificationDeclaration of unmodified opinion
Auditor's opinion
Declaration pursuant to Regulation 33 (3) (d) of SEBI (LODR) Regulation, 2015: The company declares that its Statutory Auditor/s have issued an Audit Report with unmodified opinion for the period on Standalone resultsYes
Audit firm's nameWhether the firm holds a valid peer review certificate issued by Peer Review Board of ICAICertificate valid upto
1Ravi Sharma & CoYes31-03-2028



Statement on Deviation or Variation for proceeds of Public Issue, Rights Issue, Preferential Issue, Qualified Institutions Placement Etc. (1)

Mode of Fund RaisingPublic Issues
Description of mode of fund raising (Applicable in case of others is selected)
Date of Raising Funds05-09-2025
Amount Raised8107.53
Report filed for Quarter ended31-03-2026
Monitoring AgencyApplicable
Monitoring Agency Name, if applicableCrisil Ratings Limited
Is there a Deviation / Variation in use of funds raisedNo
If yes, whether the same is pursuant to change in terms of a contract or objects, which was approved by the shareholders
If Yes, Date of shareholder Approval
Explanation for the Deviation / VariationNot Applicable
Comments of the Audit Committee after reviewNil
Comments of the auditors, if anyNil


Sr.Original ObjectModified Object, if anyOriginal AllocationModified allocation, if anyFunds UtilisedAmount of Deviation/Variation for the quarter according to applicable objectRemarks if any
1Capital expenditure towards purchase of additional equipments and fleetsNot applicable4174.3802772.040
2Repayment / prepayment of certain outstanding borrowings availed by our CompanyNot applicable2305.2502305.250
3General Corporate PurposesNot applicable973.12976.04976.040A portion of the Initial Public Offer (IPO) being 73600 Equity Shares not exceeding 0.51 percent of the Post Offer Equity Share Capital of the Company, was available for allocation to Eligible Employees, on a proportionate basis (Employee Reservation Portion), aggregating to Rs 186.21 lakhs, carrying a discount of Rs 10 per Equity Share on the Offer Price of Rs 263. Accordingly, the Gross proceeds as stated in the Prospectus was Rs 8,104.61 lakhs assuming full subscription in Employee Reservation Portion. However, as per the Basis of Allotment approved by BSE Limited, there was an undersubscription of 29,200 Equity Shares in the Employee Reservation Portion, which were then allotted to other categories (to which such discount was not applicable), in accordance with applicable provisions of SEBI ICDR Regulations and the Prospectus. Hence, an excess of Rs 2.92 lakhs was received due to allotment to other categories to which discount was not applicable. Therefore, the Gross Proceeds from the Offer results as Rs 8,107.53 Lakhs post addition of in Rs 2.92 lakhs. The said excess amount resulting from the undersubscription in employee reservation portion has been utilised towards General Corporate Purposes (GCP), hence GCP stands revised to Rs 976.04 Lakhs instead of Rs 973.12 Lakhs as stated in Prospectus, however the amount utilized for GCP is not exceeding 15 percent of the Gross Proceeds or Rs 10 crores whichever is lower, in compliance with applicable provisions of SEBI ICDR Regulations.
4Issue ExpensesNot applicable651.860651.790Total issue related expenses as stated in Prospectus was Rs. 803.74 lakhs (Inclusive of GST as applicable). Out of the Total Offer related expense of Rs. 803.74, Rs. 651.86 Lakhs was apportioned to the Company from Fresh Issue Proceeds and Rs.151.88 Lakhs was apportioned to Selling Shareholders (Except for the Listing fees, which was borne by the Company, all other expenses relating to the Offer as mentioned in the Prospectus are being borne by the Company and the Selling Shareholders in proportion to the Equity Shares contributed / offered in the Initial Public Offer).


Signatory Details

Name of signatorySurbhi Maloo
Designation of personCompany Secretary and Compliance Officer
PlaceJaipur
Date18-05-2026